Groundlane

Concrete Calculator

Estimate concrete for slabs, footings or columns in cubic yards.

ft
ft
in
%
$/cubic yard

Concrete needed

0.81 cu yd

Total volume
20 ft³
Pre-mixed 60lb bags
49 bags
Pre-mixed 80lb bags
37 bags

Estimated material cost

$134

How we calculate this

For slabs and footings: volume = length × width × thickness ÷ 27. For columns and round footings: volume = π × radius² × height, using diameter ÷ 2 for the radius. Multiply by quantity for repeated footings (e.g. multiple fence post holes).

Example

Four fence post footings, each 12 inches in diameter and 2 ft deep, need about 6.28 cubic feet of concrete total — well under a single cubic yard.

Measuring tips

For footings, measure the hole diameter and depth. For slabs, use the Concrete Slab Calculator for a more focused workflow with bag-count output.

Common mistakes

  • Forgetting to multiply by quantity when pouring multiple identical footings.
  • Mixing up diameter and radius when entering column dimensions.
  • Not adding waste for spillage, especially on small footing pours.

Frequently asked questions

How much concrete do I need for fence post footings?

Select "Column / round footing," enter your hole diameter and depth, and the number of posts — the calculator multiplies for you.

What is the difference between this and the Concrete Slab Calculator?

This calculator also supports footings and columns; the Concrete Slab Calculator is a slab-only, bag-count-focused version of the same math.

Related calculators

Estimates are provided for planning purposes. Actual material requirements may vary based on supplier specifications, compaction, site conditions, installation method, waste, and local code.